Civil Site Design

EDSI’s civil design team provides solutions to optimize the relationship between a development and the surrounding natural environment. We can assist you from the planning stages through permitting, including representation at public hearings and necessary document preparation.

 

Civil Site Design Services Include:

– Master Planning

– Grading Plans

– Erosion Control Design

– Utility Design

– Permitting/Zoning

– Construction Bid Selection, Administration, and Observation

– Owner’s Representation

– Construction Cost Estimates

 

 

civil design experience

 

Chesterfield Valley Athletic Complex Expansion

Location: Chesterfield, Missouri

Award: ACEC-MO Engineering Excellence Award – Special Projects; Honorable Mention

 

cvac

The City of Chesterfield retained EDSI to serve as the prime consultant in advancing a sustainable design master plan into a detailed design and construction initiative encompassing 220 acres of land.

 

EDSI lead a team of five sub-consultants in the execution of multiple services including detailed facility planning, architectural design, civil engineering design, structural/MEP design and geotechnical investigation. Seven separate construction packages were required for the complete project, which encompassed 15 baseball/softball fields, nine baseball practice fields, nine soccer fields, two multiple-purpose fields, two football game fields and two practice fields, two concession buildings, two playgrounds, three parking lots and one maintenance building.

 

A critical issue adding to the project’s complexity came when the City requested that football fields needed to be lit and fully served before the original deadline, so the fall season would not be interrupted. EDSI coordinated with MSD and local utilities to accommodate the need without increasing costs or compromising deadlines.

 

 

Paul Dunbar Elementary School

Location: East St. Louis, Illinois

EDSI was selected as a sub-consultant to provide a comprehensive site design plan for a new 54,000 sq. ft. school to replace an existing school on this three-acre site. Infrastructure specifications included a stormwater management plan, asphalt parking lot for 148 vehicles, plus an easy-access loading dock service area. A critical issue in this project was to keep the existing school building open and functional during construction. EDSI fenced off areas to protect children and construction equipment, and phased the work to minimally disrupt staff/students and peak traffic flows.

 

 

Douglas Walter Clark Middle School

Location: East St. Louis, Illinois

EDSI was selected as a sub-consultant to provide an extensive site design plan for a new 144,000 sq. ft. school to replace a 77-year-old facility on a 9.25 acre site. Infrastructure specifications included a stormwater management plan, asphalt parking lot for 148 vehicles, plus an easy-access loading dock service area. A critical issue with this project was that the land for the new school building had been used for years as an uncontrolled “dump area” with unanticipated levels of unusable soil. EDSI directed the environmental mediation of the area, replacing the existing soil with good engineering-quality soil to achieve a suitable sub-grade condition.